Title: PRESTON Architecture

Release Date: 2016-06-07

Document Date: 2007-07-05

Description: This GCHQ document dated 5 July 2007 provides technical information about PRESTON, the British system for intercepting the communications of targets under warrant: see the Intercept article Facing Data Deluge, Secret U.K. Spying Report Warned of Intelligence Failure, 7 June 2016.

Document: SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

PRESTON Architecture

Version 3.0

Synopsis

This document presents an architecture for PRESTON.

Creator:

Approver(s):

(PRESTON SDA)
(MoMo^D)

Signature Date

1 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture

Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

Distribution

By email/softcopy:

(H/OPA-SSOS)

(OPA-SSOS)

(OPA-SSOS)

(OPA-SSOS)

(OPA-SSOS)

(OPA-SSOS)

(OPA-SSOS)

(TFE)

(TFE)

(TDB)

^^^^■(tdb)

(NTAC)

(ITIP)

(TDB)

(TDB)

(TPS)

(OPD-GTE)

(NTAC)

■ (NTAC)

(NTAC)

(TPM)

(TFE)

^^■TPM)

(TDB)

(TPS)

^H(TDB)

(TPS)

(TIS)

H(TDB)

(TPS)

Document Amendment History

Version Date R&A Amendments
1.0 10 May 2006 yes First formal release
2.0 4 October 2006 yes Second formal release (reference RFC136 Sigmod/00080CPO/4502/SIG006400/12)
3.0 5 July 2007 yes Third formal release


2 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

Contents

1 INTRODUCTION...................................................5

1.1 Purpose........................................................5

1.2 Scope..........................................................5

1.3 Glossary.......................................................5

2 ARCHITECTURAL REPRESENTATION...................................7

3 ARCHITECTURAL GOALS AND CONSTRAINTS.............................8

3.1 Features........................................................8

3.2 Volumetric requirements.........................................9

4 USE-CASE VIEW.................................................11

4.1 Enable interception...........................................11

4.2 Business process detail........................................12

4.3 Collection system..............................................16

4.4 Stream routing.................................................17

4.5 Analysis model.................................................17

5 LOGICAL VIEW: OVERVIEW........................................21

5.1 Delivery......................................................21

5.2 Streamed data.................................................21

5.3 Processed data.................................................22

5.4 Offline processing and storage.................................22

6 LOGICAL VIEW: INTERCEPTION.....................................23

6.1 Overview.......................................................23

6.2 Collection domain..............................................23

6.3 Supplementary domain ..........................................24

6.4 Delivery domain ...............................................24

6.5 Other sources..................................................25

3 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

6.6 Application layer handover.........................................25

7 LOGICAL VIEW: PROCESSING...........................................27

7.1 Processing.........................................................27

7.2 Stream Subsystem...................................................28

7.3 Processed data subsystem...........................................32

7.4 Filtering and selection............................................35

7.5 Events.............................................................39

8 LOGICAL VIEW: OFFLINE PROCESSING AND STORAGE.......................40

8.1 Offline processing.................................................40

8.2 Dataflows..........................................................41

9 DEPLOYMENT VIEW: PROCESSING SYSTEM.................................42

9.1 Deployment overview................................................42

9.2 Deployment details.................................................43

10 SIZE AND PERFORMANCE ..............................................44

10.1 LI network.........................................................44

10.2 Volume management..................................................44

10.3 Diode availability.................................................45

11 QUALITY............................................................47

Reference Documents

[a] PRESTON Vision

vob: preston/tech/reqts/preston-vision.doc

[b] PRESTON Business Processes

vob: preston/tech/business/preston-business-processes.doc

[c] PRESTON System Requirements Specification

vob: preston/tech/business/preston-system-requirements-specification.doc

[d] PReStON Volumetric Model Overview

vob: preston/tech/analysis/preston-volumetric-model.doc

[e] FAgTGRO^^^^^^^

4 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

1 INTRODUCTION
1.1 Purpose

The purpose of this document is to present the PRESTON architecture.

Version 3 incorporates developments for NHIS 2 processing.

1.2 Scope

From DCSD web site:

"PRESTON collection is the warranted intercept of UK line access. It covers
fixed and mobile communications; and voice and data. Each target must be
covered by a RIPA 8(1) warrant. GCHQ is one of eight intelligence and law
enforcement agencies involved in this type of collection."

RIPA 8(1) provides for warrants to be placed on a person or organisation.

This document provides an end-to-end architecture for deriving intelligence from
packet-based intercept acquired from RIPA 8(1) warrants. Intercept acquired in this
manner is often referred to as Lawful Intercept (LI).

This PRESTON architecture is future facing, so the following things are in scope:

C2C intercept.

• LI streams and processed data, which are delivered using the LI, network.
(a.k.a. NTAC strategic network)

and so the document excludes:

• Circuit-switched intercept. Much of this is likely to be superseded when the UK
infrastructure migrates to VoIP. VoIP intercept is in scope. Circuit-switched
intercept which is translated to an IP intercept handover is in scope.

• BOXSTER, MARMION, GENTIAN. These systems are legacy circuit switched
and line access solutions.

1.3 Glossary

GCHQ Government Communications Headquarters

NTAC National Technical Assistance Centre, and is responsible for maintenance
of the LI capability on the UK on behalf of the intelligence and law
enforcement agencies.

LI Lawful Intercept refers to intercept gained as a result of the use of a legal

instrument to obtain interception services from a CSP.

Active LI LI intercept which doesn't follow the standard passive LI intercept model.
Interaction with the CSP may be required e.g. cloned email accounts.

5 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

NHIS National Handover Interface Specification - the UK-mandated handover
mechanism for warranted intercept.

TERRAIN C2C Processing system used at GCHQ.

CSP Communication Service Provider

6 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

2 ARCHITECTURAL REPRESENTATION

The features which deliver the PRESTON architecture are largely realised in the

PRESTON Processing system. Thus, the representation of the PRESTON

Processing system forms the largest part of this document.

The PRESTON architecture is represented using the following views:

• Section 4 presents a Use-Case view. This is a brief overview of the use
cases which are architecturally significant.

• Section 5 presents a Logical view overview.

• Section 6 presents a Logical view of the Lawful Intercept capability. This
describes the functionality which implements the warrants derived from the
Enable collection business use case and delivers the intercept to GCHQ. This
part of the system is provided by NTAC.

• Section 7 presents a Logical view of the Processing capability. This
describes the part of the system which integrates the NTAC-managed delivery
network, applies processing and derives intercept items for storage.

• Section 8 presents a Logical View of the Offline processing and storage
aspects which store and render intercept for analysts.

• Section 9 presents a Deployment view which describes how the facilities
described in the Logical views are deployed.

7 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

3 ARCHITECTURAL GOALS AND CONSTRAINTS
3.1 Features

This table is a copy of the Features from the PRESTON Vision (reference [a]):

Id Description Priority Derived
FEAT2 The system will be deployed diversely across two sites to allow operations to continue on failure of one site. Highly Desirable NEED7
FEAT3 The system will support processing of broadband1 intercept. Essential NEED7
FEAT4 A comprehensive LI interception capability will be provided by NTAC. Essential NEED7
FEAT5 The system will present intercept to analysts in a manner consistent with other accesses. Highly Desirable NEED7
FEAT6 The system will support processing of mobile intercept. Essential NEED7
FEAT7 The system will support the processing of data which is received from NTAC's PDO (Processed Data Output) service. Essential NEED7
FEAT105 The MTRR of the operational LI processing service shall be less than 24 hours. Highly Desirable NEED7
FEAT9 The legacy PRESTON delivery infrastructure shall cease to incur maintenance costs. Highly Desirable NEED7
FEAT10 A secure managed interface will provide an accredited interface to the NTAC LI network. Essential NEED7
FEAT106 The system shall ensure the integrity of data so that data loss is no worse than 0.05% by volume. Desirable NEED7
FEAT12 The system shall support processing throughput up to 34 Mb/s. Essential NEED7
FEAT103 The system shall support processing throughput up to 100 Mb/s. Highly Desirable NEED7
FEAT14 The system will support delivery of LI streams to SD analysis labs for analysis. Highly Desirable NEED8

1 broadband: IP stream accesses with bandwidth above 128k e.g. ADSL or Cable modem.

8 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

FEAT19 The system will support delivery of LI streams to CESG analysis labs for the application of intrusion detection techniques. Desirable NEED9
FEAT109 The system will support delivery of LI streams to A&R labs for the purpose of applied research. Desirable NEED9
FEAT15 The system will be capable of processing VoIP presented as NHIS 2.0. Essential NEED7
FEAT16 The system will support application of VPN decryption techniques. Highly Desirable NEED7
FEAT17 The system will have processing for IP multimedia services. Desirable NEED7
FEAT18 A Memorandum of Understanding will be agreed with other agencies to support sharing of LI processing products which are sharable. Desirable NEED9
FEAT19 LI processing solutions will be made available to NTAC so that NTAC can provide LI services to all the UK intelligence and law enforcement agencies. Highly Desirable NEED9
FEAT107 The system will support delivery of events to event repositories in accordance with defined events interfaces. Desirable NEED7

3.2 Volumetric requirements

Ref [d] presents a volumetric model for PRESTON, which describes the volumetric
and performance requirements on the system. It is useful to present the findings from
that document. The document describes a requirement for egress to deliver at up to
72 Mb/s:


Totals Long-term average bandwidth: 6.3 Mb/s
Max bandwidth: 71.7 Mb/s

Fractions % of bandwidth which is broadband: 50.1 %
% of bandwidth which is voice: 48.8%
% of bandwidth which is mobile: 1.1 %

Clearly this quantity of data will be a considerable problem for processing and
storage, and so the volumetric model makes an assumption of 95% filtering of
collected C2C intercept.

9 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007


Collection Voice filtering rate: 0%
Voice collect: 1.40 Mb/s 35.00 Mb/s
C2C filtering rate: 95%
C2C collect: 0.24 Mb/s 1.83 Mb/s


95% de-selection is a reasonable estimate of what is possible based on current
understanding of how BLACKNIGHT selectors can be used to reduce data rates.
This allows us to reduce the collection rate of C2C rate to around 1.9Mb/s. For
further discussion of selection and filtering see section 7.4 on page 35.

The following storage volumes were also presented in the volumetric model, derived
from the other statistics.

C2C collection Storage duration: 6 months
Storage rate: 2.6 GB/day
Storage required: 461.6GB

Voice collection Storage duration: 6 months
Storage rate: 14.8 GB/day
Storage required: 2657.8GB

Survey store Storage duration: 6 months
Storage rate: 4.2 GB/day
Storage required: 748.8GB

10 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture

Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

4 USE-CASE VIEW

This section discusses the use case requirements gathered, and describes how they
contribute to shape the architecture.

The use cases are contained in two documents:

• Business use cases and analysis were presented in the PRESTON Business
Processes document. Use cases for the Collection system and Stream routing
functions were thus derived from the business use cases.

Use cases for the Collection system and Stream routing were presented in the
PRESTON System Requirement Specification document.

4.1 Enable interception

The Enable interception use case describes how an intelligence analyst can achieve
interception against a target.

Enable interception

Interception authority

Intelligence analyst

The use case describes how the actors apply a formal process to achieve the
interception. In short, the process covers preparing a case for interception,
application for a warrant, warrant review, and (if successful) the provisioning of the
communication intercept.

It is immediately clear that this process completely covers the legality requirements:

The process is compliant with RIPA, as no communication interception can occur
without a warrant in place. The RIPA requirements ensure compliance with HRA, in
particular, the case for interception must be strong for the warrant to be obtained.

For reference, a collaboration diagram representing the Enable interception use
cases is given below.

11 of 47

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

: Intelligence analyst

: Interception authority

: Interception capability

4.2 Business process detail

It is worth looking at a few aspects of the business process in detail (see ref [b]). The
business process used in GCHQ differs considerably from the process employed in
the other UK agencies. Some LI streams can be transitioned to collection processing
immediately if the structure of the data is well understood, and no survey is
necessary. For instance, a voice call warrant which delivers only VoIP is likely to
need no survey, as the structure of the delivered stream (64k timeslot) needs no
analysis.

Other streams, such as broadband lines need analysis, as there is no obvious default
processing configuration which can be applied to these lines. All users use of a
broadband line is different. The internet is flexible, and supports a myriad of

12 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

protocols, and so a more complex process is used.

The sequence diagram for the grant of a warrant is shown below:

: Intelligence analyst

: Interception authority

Identify target( )






Identify interception case( )



Collate s upporting evidence( )

I Produce warrant( )

Review warrant(
--------------->r

: Interception capability

Manage add task request( )

: Tasking manager

Raise warrant schedule( )



| Enable interception( ) |

Check intercept delivery )




This part of the business process takes the warrant management as far as ensuring
that the new intercept stream is delivered to GCHQ correctly. Once stream delivery
has been configured, the stream can be routed to collection or survey. Configuration
of collection processing is shown in the sequence diagram below:

13 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture

© ©

: Tasking manager : Stream routing

Update LIID tasking( )

i=i

Add tasking request( )

Implement collection task( )

Begin stream processing( )

Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

Add stream route( )

Route to ^

collection system

Putting a stream onto collection is a simple process. The Collection manager
manages the Stream routing and Collection system at the request of the Collection
manager. The fulfilment of the Tasking manager and Collection manager roles at
GCHQ is likely to be PRESTON ops, and GSOC, respectively.

Putting a stream through a survey is a key part of the process. This is depicted in the
sequence diagram below:

14 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

: Intelligence analyst

: SD analyst

Add stream route( )
[ Assess intelligence value( ) Conduct survey( ) ^0
ni

Develop processing configuration )

The stream is routed to the SD analyst who performs a survey (technical
characterisation). The Intelligence analyst is consulted to assess the intelligence
value which is used to assess whether the warrant is maintained.

If the warrant is to be maintained, the stream is migrated onto the collection
processing. A key product from the survey process is the processing configuration to
be used for collection processing. This is developed by the SD analyst - it is derived
from the technical characterisation of the new stream.

The survey process and intelligence assessment is what GCHQ provides a high
quality approach to ensuring that warrants are maintained only for appropriate
sources of intercept.

The development of the processing configuration is also a key part of managing the
data volumes. GCHQ maintains a considerably high level of volume reduction by
applying selectors and filters developed at this stage. To compare with a similar
operation, volume reduction is not a feature offered by the NTAC DPC. The DPC
applies some basic filters to eliminate protocols (such as file sharing) that none of the
agencies could possibly want. No doubt offering a filtering service for all agencies for
all targets would require a significant amount of management time.

When intercept is initially enabled, the selector or filter terms are not well understood.
They are thus developed during the survey phase, by Intelligence analysts (as part of
intelligence assessment) or by SD analysts (as part of the development of the
processing configuration). Filters developed by SD analysts are more likely to be
technology filters, whereas those developed by Intelligence analysts are likely to be
target selectors. Selectors and filters are currently managed using CORINTH.

15 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

4.3 Collection system

The use case model for the Collection system is pictured below:

nclude

<>

Add task

The Add collection Task”
and Delete collection
task use cases are from
the TERRAIN model.

End stream processing

Delete task

Stream routing

Process intercept

Intelligence analyst

The Begin stream processing use case is illustrated below. The Collection manager
is required to manage a number of things in order to successfully implement a stream
processing task:

The stream addresses assigned to each task must be managed to ensure each
collection task has a unique address.

• The collection resources must be managed.

• The LI database maps LIIDs in the input streams to metadata for GCHQ's
processing.

v

(Review collection
requirements

_________V_________

(Update LI processing
database

New collection
resource required?



yes

V

Allocate collection
res ource

V

Allocate LI stream
address

V

Ad d task

no

16 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture

Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

4.4 Stream routing

The use case model for the Stream routing is pictured below:

Modify stream route

Interception

capability

Route intercept

Collection system

The detail of the use cases is not significant at an architectural level, and won't be
discussed further in this document, although the use cases will be used to drive the
development and testing.

4.5 Analysis model

The architecture is derived from an analysis model which captures the concepts of
behaviour and responsibility in the system. The first diagram presents the use cases
mapped to logical components which deliver a stream processing functionality.

17 of 47

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

The stream input boundary
allows intercept streams to
be delivered into the
system.

External stream receiver

i

i

This boundary allows streams to be
delivered to external stream receivers
under the control of the system's routing
configuration. This ensures that there is
a single point of management of stream
routing.

Collection management

Begin stream processing...
End stream processing.)
Process intercept.)

i

i

___________i_________.

This boundary ^
allows management
of the Collection
system.

Stream management The stream management boundary allows users to

interact with the system to manage delivery of intercept
streams within or out of the system.

Stream routing This entity represents the current routing table - the

configuration instructions for the routing which should be applied to

each stream.

18 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05 5 July 2007
Stream routing This control accepts intercept streams and implements the route which has been requested for the stream.
Stream input The stream input boundary allows intercept streams to be delivered into the system.
External stream receiver This boundary allows streams to be delivered to external stream receivers under the control of the system's routing configuration. This ensures that there is a single point of management of stream routing.
Collection system This control processes intercept streams and delivers intercept items.
Intercept items receiver This boundary allows the system to deliver intercept items for further processing and/or storage.
Events receiver This boundary allows the system to deliver events for query and/or storage.
Collection tasking The collection tasking information specifies the processing which should be applied to each stream by the collection system.
Collection management This boundary allows management of the Collection system.

The system requirements (ref [c]) articulate the need for the handling of processed
data. The diagram below shows the components which deliver this functionality. The
two diagrams have Collection management and Collection tasking in common. The
functionality embodied in these concepts will be common in both processing
systems.

19 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

Processed data input

Processed data
mediation

intercept
items to

Intercept items receiver

Begin stream processing...
End stream processing.)
Process intercept.)

This boundary
allows management
of the Collection
system.

Processed data input

Processed data
mediation

This boundary allows processed data intercept to be
presented to the system.

The processed data mediation applies any conversion
required to be able to deliver processed data to the
Intercept item receiver.

20 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture
5 LOGICAL VIEW: OVERVIEW

Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

The diagram below presents an overview of the complete system.

HENCE

FUNFAIR

Cheltenham

The system consists of two processing centres deployed across two geographically
separate sites.

5.1 Delivery

Delivery to GCHQ's processing occurs on 3 domains. Streamed data is presented on
the Supplementary and Collection domains. Processed data is delivered on the
Processed domain. All domains are connected to GCHQ's networks via data diodes
for security reasons.

5.2 Streamed data

Data from the Supplementary and Collection domains is presented to the NHIS
router which can route individual intercept streams. Streams can be delivered to
TERRAIN for collection processing, or to non-operational areas such as SD or
CESG.

A separate NHIS router and TERRAIN cluster are provided for survey processing at
each site.

21 of47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

The TERRAIN system can deliver to all repositories.

5.3 Processed data

Processed data is delivered to Content Enhancement for processing prior to delivery
to the IIB.

5.4 Offline processing and storage
The TERRAIN system can deliver events:

• VoIP events in telephony form to SALAMANCA.

Geo events to SAMBOK.

• C2C events to HAUSTORIUM.

The TERRAIN system can deliver content:

• Operational collect data to Content Enhancement for processing prior to sending
to the IIB.

• VoIP call data to B3M.

• Survey or target development data to FARNDALE for analysis by SD analysts.

• SMS content to SAMDYCE.

22 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

6 LOGICAL VIEW: INTERCEPTION

6.1 Overview

The lawful intercept capability is currently managed and provided by NTAC. GCHQ
fully supports NTAC's mandate, and there is no intention of changing this
arrangement.

As well as the set of obvious set of benefits it offers HMG (e.g. pool the costs to get a
better system) there are benefits in having NTAC as the organisation which
approaches and manages the relationship with CSPs, which reduces GCHQ's
association with CSPs.

For completeness, the following sections describe the parts of the system which
comprise the LI capability.

6.2 Collection domain

The LI collection domain provides a network domain for CSPs to deliver intercept
data. CSPs which gain SECRET accreditation for their interception services may
connect directly to the LI network, while those that cannot be accredited are
connected using a diode. A number of mobile operators are connected the collection
domain. No common handover agreement has been made with mobile providers, so
each provider connects to the collection domain via a HMGCC managed mediation
unit.

The NHIS 1.1, NHIS 1.5 and NHIS 2 handovers are approved for delivery of intercept
on this network.

23 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

6.3 Supplementary domain

The LOCHNVAR project is intending to migrate circuit-switched intercept from
existing (circuit-switched) handover to an NHIS 2 handover.

The supplementary domain is intended for this purpose. A separate domain is used
for security reasons.

6.4 Delivery domain

The processed domain allows delivery of processed data to agencies. NTAC offer a
processing service for agencies, capable of processing raw data from the collection
domain, and delivering it on the delivery domain. The delivery domain is also used for
Active LI sources which are delivered to NTAC in processed form. Such sources
have no raw form, and so cannot be presented in accordance with an NHIS
handover.

24 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture
6.5 Other sources

Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

The interception of a leased line under RIPA 8(1) is a more complex warrantry
scenario. There is no standard LI handover for a leased line2, and so delivery would
not take place via NTAC-managed interception processes. Typically, a leased line is
delivered on a bespoke network, or copied through the MONACO delivery networks
to the narrowband processing systems. There are no specific PRESTON features to
this processing scenario, and no new capabilities are required as a result.

GCHQ has, as an option, the ability to use RIPA section 11 to deploy an intercept
probe outside of NTAC's management. A bespoke delivery network would be needed
to get the data to us.

6.6 Application layer handover

There is presently no support for a number of application layer handovers for which
requirements exist. For example, in certain CSPs, email or HTTP proxy interception
is performed, however there is no defined handover for this form of intercept: NHIS
1.1 is used currently.

The definition of a handover standard achieves two key things: Firstly, there is an
agreed mechanism to present the intercept data to the LEMF from the CSP.
Secondly, there is a clear set of requirements on the CSP which specify what must
be intercepted.

As there is no defined handover for e.g. an HTTP proxy interception, there is no way
to be certain that the intercept will be correctly presented, or that the intercept will be
derived in a useful way.

Consider an application layer probe deployed on a network which is removed from
the target.

The probe is likely not integrated with the ISP network, and so must deduce the
presence of a target's communications by studying the protocols which make up the

2 ETSI TS 102 815 defines a layer 2 handover mechanism which may be appropriate for a leased line,
but this is not a standard handover in the UK.

25 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

target communications e.g. by studying the application layer protocols.

Consider a typical protocol stack.

physical link network transport session presentation application

The application layer protocols may be at the top of stack of complex protocols, and
so a number of packet decoding steps may be required to get from network packets
to application layer PDUs.

In practice, this means that a target's communications may be dispersed across a
number of network packets, and that the target's communications may be
interspersed with communications which are not from the target.

some packets contain data
belonging to innocent parties

i

target data is contained in a
number of IP packets

The typical LI handover is at the network packet layer (i.e. IP packets), and yet this
handover may not offer the correct precision required to exactly capture a target's
communication.

I must conclude that, with the increasing use of application layer probes, that we
need to work with NTAC and the other agencies to ensure handover mechanisms are
defined which allow capture of target communications with application layer probes.

26 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

7 LOGICAL VIEW: PROCESSING
7.1 Processing

The PRESTON processing system consists of two subsystems: PRESTON stream
and PRESTON processed data.

PRESTON stream is the primary system: it realises the bulk of the use cases, and
meets the majority of the system requirements. PRESTON processed data is used to
handle the cases where intercept cannot be delivered in a stream, perhaps because
a file or message-based interception is used, in which case it is not possible to
intercept the target's raw IP streams. The processed data subsystem exists to
receive data from NTAC's PDO (Processed Data Output) service. The PDO service
supplied by NTAC is positioned by NTAC to be the primary mechanism for delivery of
intercept to NTAC's agency customers.

For this purpose, NTAC makes available to its customers a specification for the
service interface. The output format is referred to as MIME/CCDF, and is derived
from the GDR ICD used internally within GCHQ. MIME/CCDF carries CCDF 4.1
payloads to describe meta-data.

While NTAC positions PDO as the primary service available to agencies, GCHQ's
needs are such that it primarily intends to use NTAC's raw data service, where raw
data is delivered to the agency directly from the point of intercept.

Our justification for using the raw service is that:

We have more advanced processing facilities, which are necessary for us to
use, since our PRESTON targets typically require more complex processing
than that required for other UK targets.

• We use (broadly) the same GCHQ-developed processing equipment to that in
use by NTAC, so our use of the raw service doesn't undermine NTAC's
investment in our products, as the majority of the developments we produce in
support of the raw processing will be made available for NTAC to use.

Our need to analyse the data using SD techniques requires that raw data be
made available to the SD community. GCHQ regularly performs collection or

27 of47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

survey development activities on behalf of other agencies, and this is only
possible by having a dedicated processing system.

7.2 Stream Subsystem

7.2.1 Overview

The purpose of the stream subsystem is to accept raw unprocessed data from the LI
network Collection Domain (CD), apply processing, and deliver the processed data to
Offline Processing.

The stream subsystem consists of three components:

The stream diode, which provides the security protection between the LI
network, and GCHQ's internal networks.

• The stream router, which routes the LI, streams to the various processing
elements.

• The intercept processing system (TERRAIN) which processes the LI stream to
resulting intercept items.

The stream input diode interfaces directly with the LI network. The stream output
diode interfaces directly with the NHIS router via GCNet. The two nodes are
connected via an optical one-way interface allowing communication in one direction
only. The one-way network is managed using the NHIS diode software developed by
TPS.

28 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

7.2.2 The stream diode

The stream diode, is a managed interface which permits NHIS intercept streams to
be delivered from a lower-security to a higher-security network. Intercept is allowed
to pass to the higher security network, but data may not pass in the other direction.
Thus, the security of the higher security network is not compromised.

The components of the stream diode are shown below:

NHIS 1.5 receiver

29 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

The stream diode software consists of a set of proxies, which allow NHIS streams to
transit over a one-way optical network. There is a set of proxies (input and output) for
each NHIS protocol variant. The input proxies convert the NHIS streams to a private
protocol form which can pass over the one-way network. The output proxies convert
the private protocol back to the correct NHIS stream format.

The input and output proxies communicate with a monitoring process which tracks
the state of all processes. The status monitor can thus report on the failure of a
process on the input and output sides of the diode, or the failure of the one-way
optical link.

The diode terminates NHIS streams on the input side, acting as a standards-
compliant NHIS receiver. The NHIS streams transit the one-way network in an
internal representation of the NHIS PDUs and are reconstructed on its output. The
diode must act as an NHIS compliant sender on the output side.

The status interface allows the diode to be monitored manually by operators.
Alternatively, a monitoring facility such as HP Openview can be used.

The diode software is a GCHQ-developed solution called the NHIS diode. It is
currently managed by TPS, but is being transitioned to an external contract.

30 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture
7.2.3 The stream router

Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

The stream router is implemented by the NHIS router product. The purpose of the
router is to accept (terminate) NHIS streams on its input, and then copy the streams
to one or more destinations as specified by an operator.

The NHIS router presents an NHIS interface for NHIS 1.1, NHIS 1.5 and NHIS 2.0
data. The NHIS connections are terminated on the NHIS router. New NHIS
transports are used to deliver the NHIS input to destinations according to the routing
rules, which are edited using a local web interface. The NHIS router is thus required
to implement fully-compliant NHIS sender and receiver stacks to perform this role.

The NHIS router can be configured to offer an alternative delivery mechanism which
is raw Ethernet packets to an Ethernet network. This mode of operation is not
intended for use in the operational system, but can be used in Sd areas to deliver
NHIS-packaged data to systems which can only accept raw Ethernet input.

The stream router will be configured to deliver data to the following destinations:

• Operational TERRAIN processing at HOTLINE or Benhall.

• SD analysts in GTE survey. Two destinations will be configured - one for
NHIS 1.1, one for NHIS 1.5. These destinations will be on an NHIS router
deployed at GTE.

• CESG intrusion detection. Two destinations will be configured - one for NHIS
1.1, one for NHIS 1.5. These destinations will be on a network endpoint to be
specified by CESG.

31 of47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

• Applied Research. Two destinations will be configured - one for NHIS 1.1, one
for NHIS 1.5. These destinations will be on a network endpoint to be specified
by CESG.

The stream router implements a buffering resource, which serves as part of the
NHIS, features to replay data for failed connections. As this buffering resource is
limited, it will be assigned only to the operational processing streams, so that data
will not be buffered when streams to AR, GTE or CESG fail.

The stream router is implemented by the NHIS router product, which is managed and
developed for GCHQ by LogicaCMG.

7.2.4 Intercept processing

The intercept processing is performed by the TERRAIN system. The TERRAIN
system is delivered with an LI configuration component, which contains configuration
specific to the LI environment. TERRAIN supports processing of NHIS 1.1, NHIS 1.5
and NHIS 2 intercept streams.

The TERRAIN system can integrate with a number of systems at GCHQ: FARNDALE
for survey data, BLACKNIGHT for selection, GDR/CE/IIB for delivery of collection
data, BRIGHTON for legacy delivery. SALAMANCA, HAUSTORIUM, SAMDYCE,
SAMBOK for events.

7.3 Processed data subsystem

7.3.1 Overview

The purpose of the Processed data subsystem is to facilitate the delivery of
processed intercept from the LI network Delivery Domain (DD) to GCHQ's processing
facilities.

The data conforms to the GDR ICD, but the data model inside SPQR currently varies
from that used in NTAC, so it is necessary for the data to be converted to conform to
SPQR meta-data management.

The connection between GCHQ and NTAC must be managed, therefore it is
necessary for a security barrier to protect GCHQ's networks.

32 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

PDO receiver TERRAIN taskmgr client GDR client

The processed data subsystem logically offers three components:

A PDO receiver accepts the data from NTAC it must offer an interface which

conforms to the PDO ICD.

• A PDO client performs any alterations to the data so that it can be presented to
the GDR system.

• A PDO output delivers the data to the GDR system.

33 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

The system is pictured in detail above. The system consists of two nodes connected
by a one-way optical network. The one-way network is managed by the Sybard diode
product which manages the delivery of files over the diode network.

The PDO reception interface is implemented using a standard HTTP server (Apache)
and a simple input processor which transfers the files from the HTTP server to the
Sybard diode to deliver across the network.

The delivery interface consists of the Output processor, which bridges the delivery
from the Sybard diode to the PDO client. The PDO client performs the data
conversion, and uses the tasking information from an operational TERRAIN to apply
meta-data (case notation, PDDG etc.) that is needed for the data to conform to the
SPQR data model.

The reformatting of meta-data, and the use of the TERRAIN tasking information is a
short-term measure which can be improved by aligning the GCHQ and NTAC
intercept data models.

Monitoring can be performed using HP Openview software on the output diode to
monitor the Sybard software which allows the status of both sides of the diode to be
ascertained.

7.3.2 PDO client

The collaboration diagram shows how the components interact to deliver the
intercept items to the GDR.

34 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture

Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

3: Process intercept

7.4 Filtering and selection
7.4.1 Overview

PRESTON presents a considerable data management problem to GCHQ. On the
face of it, the intercept data is well selected: a number of targets are selected, and
only intercept from those targets is delivered to GCHQ. By definition, Strong
Selectors are used to manage the volumes - we are only able to intercept targets for
whom a strong business case (warrant application) can be made for cover, as
mandated by RIPA.

The PRESTON Volumetric Model (see ref [d]) describes the impact of accepting data
from our warranted intercept targets. The intercept from that number of targets is
considerably more than our databases can store. We are currently not able to put on
cover the full set of desired broadband targets, for a number of reasons, a big one of
which is bandwidth to the databases. FARNDALE is currently overloaded, but without
selection, these feeds cannot be transferred directly to the IIB, as the network path to
the IIB will not support the appropriate load.

Dataflow have demonstrated that considerable bandwidth reduction can be gained by
applying selection and filtering to the data streams. Two types of volume reduction
are used:

• Selection: Further strong selectors can be applied to the LI stream to select

particular targets. This can be used where the warranted entity is an
organisation, and the selection of particular targets within that organisation can
be particularly effective.

35 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

• Filtering: Filtering can be applied to remove items with low intelligence value.
Such data can include SPAM, adverts, viruses, pornography and open source
material which will not be of interest to us.

It is thus necessary to apply both Selection and Filtering to the intercept to reduce the
volumes to a manageable level. The volumetric model (ref [d]) used an estimate of
95% de-selection rate to derive the data volumes to the collection repositories.

Further study may be required to establish if this level is achievable.

This approach is at odds with the generic MoMo approach, where positive strong
selection is the only selection mechanism, and deselection is not a supported
process.

With warranted intercept, many of the filter/selector terms are derived from SD
analysis of the target data during surveys - it is essential these selectors are derived
before the intercept streams are transitioned to collection otherwise the data volumes
cannot be managed.

The diagram below gives a representation of a typical selector in the current
PRESTON dictionary from CADENCE. Selectors are grouped and combined with
defeats which are likely to detect traffic which is not of interest.

Filtering terms are typically crafted as part of development of the processing
configuration, and are thus specific to one target line. In the current dictionary, there
is little category re-use, as categories are crafted for each target line. It isn't clear if
things would be managed when we have many more broadband targets intercepted
under PRESTON.

36 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

I look at the Filtering and Selection options available.

7.4.2 Option 1: Current system

selectors

The current system uses BLACKNIGHT for selection. Survey data can be routed to
either BRIGHTON or FARNDALE by the BLACKNIGHT system.

Selectors are delivered to BLACKNIGHT using the CADENCE dictionary
management system using an established dictionary management process.

Pros: Established delivery path for selectors. Established business process for
managing filtering.

Cons: BLACKNIGHT is no longer supported. BLACKNIGHT will not support the data
rates from high-bandwidth sources (high speed DSL, BT21c). BLACKNIGHT will not
integrate with the SPQR systems (GDR, CE, IIB) and a convoluted delivery path (via
BRIGHTON) is needed to deliver data to IIB.

7.4.3 Option 2: Use TERRAIN to route

selectors

We have the option to use the BLACKNIGHT system in an alternative scanning
mode, so that it performs selection, but does not perform routing. This has the
advantage that it could be used to provide selection on data which is to be delivered

37 of47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

as CCDF to Content Enhancement. Data could thus be delivered to SPQR after
BLACKNIGHT scanning.

This does not solve the bandwidth limitation problems with BLACKNIGHT.

Pros: Established delivery path for selectors. Established business process for
managing filtering. Sane delivery path to SPQR systems.

Cons: BLACKNIGHT is no longer supported. BLACKNIGHT will not support the data
rates from high-bandwidth sources (high speed DSL, BT21c).

7.4.4 Option 3: Use TERRAIN for filtering and selection

TERRAIN is able to apply boolean selectors to intercept for selection and filtering
purposes. The selection engine, FAST GROK is able to apply strong selection and
filtering in a manner which is similar to the BLACKNIGHT functionality (see ref [e]).
FAST GROK is a low cost scanning algorithm. The FAST GROK engine was
developed as part of TERRAIN 9 to replace use of the 6 selection engines in use,
and the plan is to ensure that this engine deprecates all other use.

The FAST GROK engine will happily work with any of the selector sets (TACHO,
CORINTH, TRAFFIC MASTER) which TERRAIN receives, and thus it replaces the 6
of selection engines in TERRAIN with a single high-speed dictionary which meets all
requirements. The algorithm can optionally use a dictionary format (FAST GROK
dictionary) which has never been exposed outside of TERRAIN.

The FAST GROK dictionary format is semantically, nearly equivalent to the
BLACKNIGHT Netlayer dictionary format, and thus a conversion from Netlayer to
FAST GROK may be achievable.

It is possible to have TRAFFIC MASTER distribute FAST GROK dictionaries,
although work would be needed on TRAFFIC MASTER to achieve this.

Pros: Selection and filtering will work at required rates. Sane delivery path to SPQR
systems.

Cons: No established delivery mechanism for management of the dictionary.

38 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture
7.4.5 Selected approach

Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

There is no clear solution to the Filtering and Selection problem. The use of
BLACKNIGHT cannot continue in PRESTON because of the increase in data
volumes which BT21c promises, and the increase in target coverage which CSIP
require. The lack of support for BLACKNIGHT is a major problem with us continuing
to use the system.

None of the potential replacement systems (KEYCARD, X-KEYSCORE,
COURIERsKiLL) can be used to integrate with SPQR as CCDF is not on NSA's
roadmap for these systems.

My recommendation is that a selector distribution mechanism be used for strong
selectors e.g. MONKEY PUZZLE/TACHO.

My recommendation is that FAST GROK dictionaries are maintained on TERRAIN
for target-specific filtering terms, if they are required. This should be considered an
initial response to the increasing rates.

Further study work is needed to ascertain whether an appropriate selector
management system is needed for filter terms, and what support (e.g. TRAFFIC
MASTER management) needs to be created.

7.5 Events

The stream subsystem will be able to use TERRAIN to integrate with SAMBOK,
SALAMANCA and HAUSTORIUM to deliver events.

There is no offline event extraction facility, and there is no intention to build one. We
will thus not be able to extract events from the data delivered on the Processed
domain unless NTAC undertake to provide an events capability in the processing
centre.

39 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

8 LOGICAL VIEW: OFFLINE PROCESSING AND STORAGE
8.1 Offline processing

I return to the diagram presented in section 5 to illustrate dataflows. This architecture
intends to see all collection C2C delivered to Content Enhancement for delivery to
the IIB. Survey data is intended to be delivered to FARNDALE, as at present.

The filtering approach is required in order to be able to manage the volumes which
are derived from the considerable input to the processing.

HENCE

FUNFAIR

Cheltenham

40 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

8.2 Dataflows

The following dataflows exist for processed data:

Source Destination Interface Description Estimated volumes per day
Processed domain PDO client NTAC PDO Delivery of processed data from NTAC. 200MB, 1500 items
PDO client CE CCDF/MIME (GDR ICD) For offline processing. 200MB, 1500 items
TERRAIN FARNDALE CCDF/MIME (GDR ICD) Survey data. 4.2GB, 40 000 items
TERRAIN CE CCDF/MIME (GDR ICD) Processed intercept for offline processing. 2.6GB, 27 000 items
CE IIB GDR baton Intercept for storage. 2.8GB, 28 500 items
TERRAIN SAMBOK SAMBOK ICD Target location events.
TERRAIN SAMDYCE SAMDYCE ICD SMS content.
TERRAIN B3M B3M ICD Voice content. 15GB, 2500 items
TERRAIN VSLT SALAMANCA ICD Telephony events.
TERRAIN HAUSTORIUM PILBEAM ICD C2C events.

The volume estimates are derived from the volumetric model.

The volumetric volume has no information on events or SMS. Volumes for SMS
content and Telephony events are not expected to change significantly from what
they are now, although analysing this information remains important to understand
the impact from the business on deploying this architecture.

41 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

9 DEPLOYMENT VIEW: PROCESSING SYSTEM
9.1 Deployment overview

The deployment consists of a number of site deployments, each of which is capable
of interfacing with the NTAC networks, and delivering data to the Cheltenham
network repositories.

The deployment is pictured below:

The current proposal is to deploy two sites.

The site deployment consists of:

• a stream diode for each LI network stream delivery. We currently plan for two
stream network connections for the Supplementary domain, and the Collection
domain.

• a batch diode for each LI network processed data delivery. We currently plan for
one for the Processed domain.

• a collection facility consisting of a single NHIS router, and a number of

terrains.

• a survey facility consisting of a single NHIS router, and a number of TERRAINs.

The PRESTON systems could use TERRAIN capability from existing deployments.
There is an advantage of deploying specific PRESTON TERRAIN systems for
processing in collection and survey, as this allows for more agile deployment of
PRESTON-specific features in the future.

42 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

Also, there may be a requirement in the future to provide for stricter auditing controls
over PRESTON intercept as a result of changes to UK legislation. Separate
PRESTON systems allow for the easier introduction of PRESTON-specific auditing
requirements.

9.2 Deployment details

At each site, it is proposed to deploy 10 TERRAIN systems for collection purposes,
and 5 TERRAIN systems for survey purposes.

Purpose System Hardware Software
Supplementary domain Network connection 100 Mb/s network connection
Stream diode NHIS diode hardware (2 servers) NHIS diode
Collection domain Network connection 100 Mb/s network connection
NHIS diode hardware (2 servers) NHIS diode
Processed domain Network connection 100 Mb/s network connection
Batch diode 2 servers Sybard software, PDO client
Operational collection NHIS router 1 server NHIS router
TERRAIN 10 servers TERRAIN
Survey NHIS router 1 server NHIS router
TERRAIN 5 servers TERRAIN

43 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture

10 SIZE AND PERFORMANCE

Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

10.1 LI network

Returning to the values from the volumetric model:


Totals Long-term average bandwidth: 6.3 Mb/s
Max bandwidth: 71.7 Mb/s

Fractions % of bandwidth which is broadband: 50.1 %
% of bandwidth which is voice: 48.8%
% of bandwidth which is mobile: 1.1 %

It is clear that the delivery network must be able to sustain burst loads of around
75Mb/s. This load is expected to be delivered across the LI network's Collection
Domain and Supplementary Domain. It is expected that the load will be roughly
equally spread across Collection Domain (for broadband) and the Supplementary
Domain (for voice).

To deliver this architecture, a number of features must apply to the end-to-end
system, including the LI network. The following features cannot be delivered unless
there is support in the LI network:

FEAT105 The MTRR of the operational LI processing service shall be less than 24 hours. Highly Desirable NEED7
FEAT106 The system shall ensure the integrity of data so that data loss is no worse than 0.05% by volume. Desirable NEED7
FEAT12 The system shall support processing throughput up to 34 Mb/s. Essential NEED7
FEAT103 The system shall support processing throughput up to 100 Mb/s. Highly Desirable NEED7

10.2 Volume management

The components of the system manage volumes thus:

Feature Benefit
NHIS router LI streams can be delivered to multiple processing systems to share the load.
NHIS router Manages delivery of LI streams so that only wanted streams are delivered to e.g. CESG.

44 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

TERRAIN Multiple TERRAIN systems can be deployed to ensure that the TERRAIN system is not a bottleneck.
FARNDALE Provides a local repository for survey data is not a burden on the delivery networks or the collection systems.
TERRAIN Applies selection so that volumes are considerably reduced presentation to Content Enhancement. This is particularly important since that delivery route may traverse a WAN link.

10.3 Diode availability

The availability requirements present us with a problem:

FEAT106 The system shall ensure the integrity of data so Desirable NEED7
that data loss is no worse than 0.05% by
volume.

This requirement can easily be met by most of the components specified in the
architecture, and all delivery mechanisms (including NHIS) support reliable delivery
of data.

However, the use of data diodes presents a problem here. As the input side can only
deliver to the output side, if there is a failure of the one-way link, or the output side,
there is no way for the input side to determine that there is a failure and buffer data.

This failure mode is different from others, as while the diode is in this mode, data is
lost forever. Contrast this with failure of e.g. the LI network, where the CSP will buffer
data and re-deliver when the LI network returns.

Although the failure of the one-way link or the output side will likely be detectable by
management systems, there is still a high likelihood that the standard support
response (in the region of a few hours) be too long. Schemes have been proposed to
deal with this data loss problem, such as, allowing something on the high security
side to switch off the input side.

Other possibilities include constructing a highly available diode with redundant
components:

45 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

The increased resilience of this configuration would considerably reduce the risk of
failure, and thus reduce data loss. A fully redundant diode may be expensive: a
cheaper configuration might be introduced by removing the redundancy of the input
side:

Failure of the diode input side does not result in data loss for NHIS delivery, as the
NHIS protocol includes features which provide resilience against data loss.

The design of a highly available data diode is beyond the scope of this document,
and is a matter which requires further study. This topic is something which
GREENHEART phase 3 may accept as a study task.

46 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

SECRET STRAP 1 UK EYES

PRESTON Architecture Sigmod/00007CPO/4502/SIG011000/05

5 July 2007

11 QUALITY

Maintaining the quality of NHIS processing products is a challenge. NHIS protocols
are intercept protocols. Although NHIS 1.5 and 2.0 are based on ETSI standard
protocols, Li protocols are still a "niche" market for protocols.

It is thus important for the engineering community to invest in test and analysis
products which can be used to test and diagnose problems with NHIS delivery.

Two key products are:

• NHIS emulators which are able to present an NHIS receiver or sender interface.

• NHIS analysers which can passively report on the behaviour of observed NHIS
communications.

GCHQ maintains an emulator product under the GREENHEART contract. We should
consider how to engage with the LI community on acquiring an analyser product.

We may consider whether the open source product Wireshark may well make a good
base for such a product. Addition of NHIS plug-ins to Wireshark would be able to
harness Wireshark's analysis capabilities, so that a complete protocol stack e.g. VoIP
in NHIS could be analysed.

47 of 47

This information is exempt from disclosure under the Freedom of Information Act 2000 and may be subject to exemption under
other UK information legislation. Refer disclosure requests to GCHQ on

SECRET STRAP 1
UK EYES

e-Highlighter