Title: FAIRVIEW: CLIFFSIDE Site – Collection Resumes After ~5 Months

Release Date: 2015-08-15

Document Date: 2011-08-23

Description: This 23 August 2011 post from the internal NSA newsletter SSO Weekly describes the disruption caused to collection from a Japanese-American cable by an earthquake. The date of service resumption correlated with the AT&T operated cable in the region: see the New York Times article AT&T Helped U.S. Spy on Internet on a Vast Scale, […]

Document: (TS//SI//NF) FAIRVIEW: CLIFFSIDE Site - Collection Resumes After

Months
By H

on 2011-08-23 0805

~5

(TS//SI//NF) On 5 Aug 2011, collection of DNR and DNI traffic at the
FAIRVIEW CLIFFSIDE trans-pacific cable site resumed, after being
down for approximately five months. Collection operations at
CLIFFSIDE had been down since 11 March 2011, due to the cable damage
as a result of the earthquake off of the coast of Japan. The initial
damage assessment showed the loss of collection of 275 El DNR
circuits and 55 DNI circuits. Since the cable was repaired and
returned to service (5 Aug), FAIRVIEW operations has tasked 205 El
DNR circuits and 37 DNI circuits for collection. Enviornmental
survey continues to compare the old enviornment footprint to the new
environment footprint and FAIRVIEW operations will continue to task
collection for all new and restored circuits.

POC:

S35333,

(FAIRVIEW Collection Manager)

e-Highlighter

Click to send permalink to address bar, or right-click to copy permalink.

Un-highlight all Un-highlight selectionu Highlight selectionh